SPKLU TSI

TSI Stations.

SPKLU TSI stations are built by TSI with TSI funding. View station photos and discuss the potential of your site.

SPKLU TSI EXAMPLES

Four locations.
SPKLU TSI documentation.

Canopy-covered electric vehicle charging area at Lot66 Mega Kuningan.
Two electric vehicle chargers under a canopy at Pertamina Fatmawati.
Canopy-covered electric vehicle charging bays at Plaza Setiabudi.

Plaza Setiabudi

TSI Station

Electric vehicle charging equipment and parking area at Grand Rubina.

Grand Rubina

TSI Station

STATION DEVELOPMENT

Station development tailored to the site.

Planning starts with the site conditions, the vehicles to be served, and the available power supply. The proposal sets out the construction scope and project terms.

Equipment, construction work, project stages, and maintenance needs are discussed as part of the station plan.

Discuss your station plans

FROM PLAN TO STATION

The steps to build
and maintain
a station.

Complete station services cover planning, construction, testing, and maintenance. The scope of each project is defined in the proposal.

  1. Requirements planning

    Identify the location, vehicles, usage patterns, and purpose of the station.

  2. Layout & capacity design

    Plan charger placement, vehicle circulation, and power requirements.

  3. Complete station proposal

    Define the equipment, scope of work, and implementation plan.

  4. SPKLU permitting

    Prepare the required permitting documents within the project scope.

  5. Construction

    Build the station in accordance with the design and proposal.

  6. Testing & commissioning

    Check functionality and completed work before handover.

  7. Regular maintenance

    Plan maintenance around the station’s requirements.

COMMON QUESTIONS

Frequently asked
questions.

Does a consultation mean funding has been approved?

A consultation is the first step in understanding requirements and assessing the location. Funding decisions and scope follow TSI’s process and proposal.

What information should I prepare?

Prepare the location, your relationship to it, property type, intended users, and power supply readiness if known. Technical details can be completed during the discussion.

Where can I see station examples?

Available documentation covers Lot66 Mega Kuningan, Pertamina Fatmawati, Plaza Setiabudi, and Grand Rubina. The photos document these locations and do not show live charging availability.

NEXT STEPS

Discuss your site's suitability for a charging station.

Tell us about the site, intended users, and development plans to start the discussion.

Start a consultation