TSI team · EV charging guide
1. Start with the vehicle specifications.
Record the vehicle model, DC connector, battery voltage range, current limit and the manufacturer’s stated charging capabilities. If different vehicle models will use the same station, provide specifications for each. A matching connector alone does not establish compatibility; voltage, current and protocols also need to be checked.
| Charger connector | Models to discuss |
|---|---|
| CCS2 | TSI DC 60, TSI DC 120, TSI DC 180, TSI DC 240 |
| GB/T | TSI GB400-LC, TSI GB480-LC |
2. Match the vehicle and charger capabilities.
Compare the vehicle specifications with the output range and current limits on each charger’s product page. The power a vehicle receives depends on its charging capability and battery condition. Vehicle numbers, daily energy needs and available charging time help define the station requirements. A higher charger rating does not automatically mean faster charging for every vehicle.
3. Distinguish total power from power per connector.
The kW figure in the model name indicates the charger’s total power, rather than a guaranteed amount for each vehicle. TSI DC 60 and TSI DC 120 share power dynamically according to vehicle demand and use 30 kW AC–DC rectifier modules. A module’s capacity does not represent a fixed allocation to each connector. For simultaneous charging, check the selected model’s power specifications against each vehicle’s requirements.
4. Prepare the site and installation scope.
Discuss charger selection alongside the available electrical supply and equipment layout. Provide the following information to clarify the installation requirements and quotation:
- Available electrical capacity and the planned number of charging points.
- Parking positions, cable routes, installation space and maintenance access.
- User groups, vehicle numbers, arrival patterns and parking duration.
- Vehicle models to be served and plans for using both connectors.
Discuss the equipment, installation scope, testing, handover and maintenance coverage before accepting a quotation. For mining sites, include the operating cycle and site conditions; equipment selection still needs to be based on the vehicle specifications.
Use the application pages to prepare your site requirements. This information provides a starting point for consultation before the equipment configuration and scope of work are agreed.
These guides provide a starting point for consultation. Equipment suitability and the scope of work depend on vehicle data and site conditions.
Back to guides